-ABOUT US-


2009
World's first mobile energy storage container with LFP batteries was put into operation.
The world's first LFP BESS power plant (1MW/4MWh).
2008
Establishment of EPRI.
2023
Launched BYD MC Cube.
Launched C&I energy storage product—MC-I.
Largest wind + BESS power plant in China.
Highest altitude (5100 m) & extreme cold PV + BESS power plant.
Standalone energy storage power plant for desert scenario.
Largest grid-connected PV + BESS power plant in the U.S.
Largest PV + BESS power plant in South Africa.
2021
BYD's 406MWh Cube Pro Project in CA, U.S. was put into operation.
2020
Cube Pro won the 14th SNEC “TW-grade Diamond Award” and “2020 Most Influential Enterprise in China Award”.
2019
BYD signed the 100MWh PV + energy storage project agreement, the largest project in Mexico.
MINIES residential energy storage system passed TÜV certification.
2018
BYD's ”key technologies of LFP power battery and its application“ won the second prize in the National Science and Technology Progress Award.
2016
BYD signed the strategic agreement with EDF in France and ENEL in Italy.
2015
BYD became the only enterprise to pass the full set of certification tests for nuclear-grade energy storage equipment.
BYD had delivered 130MW in PJM power market in the U.S. with 50%+ market share.
2014
BYD's ESS became the first to pass the CSA authorized certification.
World's largest user-end LFP energy storage station was completed in BYD Pingshan.
2013
The world's largest LFP battery energy storage micro-grid project was completed in southeast, China.
The world's first nuclear-grade backup power plant in Daya Bay, using LFP battery energy storage system.
2012
BYD energy storage system appears on the Doha Climate Change Conference.
500kWh Containerized ESS was accepted by DUKE Energy.
2011
BYD began to expand into the international market, US Chevron 2MW/4MWh ESS Project--First Exported Containerized ESS.
The first 2 MW unit of the 6 MW energy storage station of the National Wind-Photovoltaic-Storage-Transmission Demonstration Project was connected to the grid successfully.
2010
BYD signed the contract with China Southern Power Grid for the world's first commercial MW-scale LFP energy storage station.
2009
World's first mobile energy storage container with LFP batteries was put into operation.
The world's first LFP BESS power plant (1MW/4MWh).
2008
Establishment of EPRI.
2023
Launched BYD MC Cube.
Launched C&I energy storage product—MC-I.
Largest wind + BESS power plant in China.
Highest altitude (5100 m) & extreme cold PV + BESS power plant.
Standalone energy storage power plant for desert scenario.
Largest grid-connected PV + BESS power plant in the U.S.
Largest PV + BESS power plant in South Africa.
2021
BYD's 406MWh Cube Pro Project in CA, U.S. was put into operation.


(Example of partners)


-OUR HONORS-